Occurred on February 9, 2019 / Graysville, Ohio, USA
Info from Licensor: This superload is the new transformer at 605,000 lbs for Washington electric co-op for the new substation in Graysville, Ohio. Total load weight according to Ohio state police was 705,000 with transformer and mule train.